iTECH2

Commercial services

Network hardware

Commercial network switch and rack hardware installation coordinated with existing devices and cabling.

Request a site survey

What the work can include

  • Rack space, mounting and uplink planning
  • Switch installation and patching according to the approved port schedule
  • Connectivity checks for connected endpoints during the maintenance window

Plan the installation

Provide equipment models, rack space, uplinks, and a list of connected systems.

Testing and handoff

Review port assignments and connectivity against the agreed migration plan.

Frequently asked questions

What should I send before a switch replacement?

Send the existing and replacement models, port schedule, and the systems that cannot lose service.

What can make a switch replacement take longer?

Unlabeled ports, incompatible uplink optics, changes in device power needs, or missing configuration can delay a swap. Review those before the maintenance window.

How do we know the replacement worked?

Test representative endpoints and critical systems against the port schedule, and confirm the agreed uplinks are operating before closing the change.

Discuss your project

Share the site address and your target date. Find your service area or view case studies before getting in touch.

Contact ITECH2

← All services

Network hardware by industry

See how the installation is planned for different facilities.

Network hardware video guide

Plan the work
Review switch ports, uplinks and rack capacity.
Verify the handoff
Confirm port assignments, labeling and the migration plan.